PRIVATE REVIEW · PROJECT RECORD UPDATED OCTOBER 15, 2026
Davin Hammond / Private project financials

Financial dashboard.

Approved scope, recorded payments and future work, kept together and separate from the build overview.

First-phase estimate R2$20,575.00

Priced body scope, before replacement parts and open items.

Deposit received$5,000.00

Cash · recorded once · receipt date to be confirmed.

Planning remainder$15,575.00

If the deposit is fully applied to phase 1. Not an amount due.

01 / Current invoice & amount due

No current invoice recorded.

An invoice and payment due date have not been entered in this portal. The estimate remainder above is for planning; it is not a demand for payment.

02 / Approved first phase

Body preparation & refinishing.

Approval reported Oct 15

Estimate C4STANG-BODY-R2 · prepared October 14, 2026. Customer approval of the first phase was reported by Mike on October 15. A signed approval record is not yet attached. Labor: 139.0 hours at $125/hour.

Component / stageHoursLabor
Further teardown / disassembly5.0$625.00
Whole-vehicle blasting4.0$500.00
Listed body-panel repairs42.0$5,250.00
Left & right inner-quarter replacement allowances24.0$3,000.00
Epoxy priming6.0$750.00
High-build priming6.0$750.00
Block sanding24.0$3,000.00
Jamb refinishing8.0$1,000.00
Exterior refinishing20.0$2,500.00
Labor subtotal139.0$17,375.00
Materials allowance, including $200 blast media—$3,200.00
First-phase priced subtotal$20,575.00
This is the priced body phase, not the complete restoration price. Replacement parts, reassembly, final alignment, color sand/buff and other open items remain outside this subtotal. The requested candy finish may require an updated coating allowance.

The original October 14 PDF is retained as issued and may show its draft status. The October 15 approval report above is the later project-record update.

03 / Completed work with payments & credits

Payment record.

EntryDateMethodAmount
Customer down paymentTo be confirmedCash$5,000.00
Total received$5,000.00

No completed-work charges or additional credits have been entered. Deposit allocation will be reflected in the applicable invoice. No second deposit has been added.

04 / Future or deferred work

Component & stage pricing.

Pending scope / not yet priced

TBD means a price has not been established. These lines are outside the first-phase subtotal and are not automatically authorized by its approval. Related tasks will be consolidated when quoted to avoid duplicate charges.

Component / stageCurrent basisEstimated amount
6.0L LS engineHelena Machine reman; 500+ hp target, specification pendingTBD
Engine installation & mountsFitment and installation requirements to be assessedTBD
4L65E / 4L70E transmissionFinal model, condition and specification to be selectedTBD
Transmission installationMounting, crossmember and control requirements pendingTBD
Driveline integrationMeasurements, connections and required modificationsTBD
Wiring harness & controlsEngine / transmission wiring and system integrationTBD
Fuel / induction selectionHolley Sniper 2, FiTech EFI or carbureted configurationTBD
Fuel pump arrangementRequested manual/mechanical approach; match selected systemTBD
Fuel lines & connectorsRouting, connections and compatible delivery componentsTBD
Suspension configuration analysisGeometry, clearance and mounting assessmentTBD
Front C4 suspension integrationFit and integrate front assemblyTBD
Rear C4 suspension integrationFit and integrate rear assemblyTBD
Suspension mounting points & bracketsDesign and fabrication after configuration reviewTBD
Wheels & tires17-inch black six-spoke direction; fitment pendingTBD
Replacement body partsExact panels and supply costs to be confirmedTBD
Candy paint allowance adjustmentAny change from current refinish allowance, if requiredTBD
InteriorScope not yet definedTBD
Panel refit & final gap settingSeparate from removal and panel repair allowancesTBD
Glass, trim & final assemblyInventory and installation scope pendingTBD
Color sanding & buffingFinish process and allowance pendingTBD
Final checks & applicable road testingTo be defined with completed-system scopeTBD
Additional findings / outside chargesIf required: concealed repair, freight, tax or outside servicesTBD
Future-work totalTBD
05 / Approvals & changes

What is recorded.

First body phase: approval reported

Reported by Mike. Original customer approval date and signed authorization have not been supplied to this record.

No priced change orders are currently recorded. Future components remain pending scope and pricing.

Questions or corrections can be discussed with Mike. This page displays the project record; it does not process payments or capture electronic signatures.

Discuss the estimate with Mike ↗